This site uses cookies.
Some of these cookies are essential to the operation of the site,
while others help to improve your experience by providing insights into how the site is being used.
For more information, please see the ProZ.com privacy policy.
Freelance translator and/or interpreter, Verified site user
Data security
This person has a SecurePRO™ card. Because this person is not a ProZ.com Plus subscriber, to view his or her SecurePRO™ card you must be a ProZ.com Business member or Plus subscriber.
Affiliations
This person is not affiliated with any business or Blue Board record at ProZ.com.
Services
Translation
Expertise
Works in:
Tourism & Travel
Advertising / Public Relations
Engineering (general)
Marketing
Business/Commerce (general)
Rates
French to English - Rates: 0.06 - 0.08 GBP per word Spanish to English - Rates: 0.06 - 0.08 GBP per word Italian to English - Rates: 0.04 - 0.06 GBP per word
Spanish to English: Fire Protection System General field: Tech/Engineering
Source text - Spanish • Tanques de agua contra incendios. Estos tanques deberán garantizar el abastecimiento de agua a todo el sistema PCI, en las peores condiciones posibles, durante un periodo de 120 minutos (2 horas).
• Grupo de bombeo de agua de PCI constituido por:
- Una (1) bomba eléctrica.
- Una (1) bomba diesel.
- Una (1) bomba jockey, para presurización de la red de agua de PCI.
Los caudales y presiones serán definidos en función de cada instalación particular.
El grupo de bombeo debe estar situado en un recinto con acceso al exterior.
• Anillo de PCI que discurre en torno a las zonas protegidas, para conducción del agua impulsada por las bombas hasta los puntos de conexión a los equipos y sistemas de agua de PCI.
Desde este anillo parten las acometidas a los sistemas fijos, monitores, hidrantes y BIEs que protegen áreas/equipos concretos de la Planta.
En general, se define para cada área un sistema principal de extinción (sistema fijo o BIEs) con cobertura de un sistema de apoyo (BIEs o extintores).
El anillo cuenta con válvulas de corte, que permiten el aislamiento por tramos del anillo. La disposición de tuberías y válvulas adoptada garantiza el suministro de agua a los sistemas fijos, monitores, hidrantes y BIEs aun en el supuesto de que algún tramo del anillo se encuentre interrumpido, de modo que siempre quede disponible el sistema principal o el de apoyo para cada riesgo.
Translation - English • Fire water tanks. These tanks shall guarantee the supply of water to the entire FPS system, in the worst possible conditions, for a period of 120 minutes (2 hours).
• The FPS water pump unit is composed of:
- One electric pump.
- One diesel pump.
- One jockey pump to pressurise the FPS water network.
The flows and pressures shall be defined according to each particular installation.
The pump unit shall be located in a room with outdoor access.
• An FPS ring that runs around the protected areas for channelling the water driven by the pumps to the connection points to the equipment and FPS water systems.
From this ring start the connections to the fixed systems, monitors, hydrants and FHCs that protect specific areas/equipment of the Plant.
In general, for each area a principal extinguishing system (fixed system or FHCs) is defined with backup by a support system (FHCs or extinguishers).
The ring has shut-off valves which allow sections of the ring to be isolated. The layout of the pipes and valves adopted guarantees the supply of water to the fixed systems, monitors, hydrants and FHCs even in the event that some section of the ring is cut off, so that the main or support system is always available for any hazard.
French to English: Website translation -www.fantasticable.fr General field: Other Detailed field: Tourism & Travel
Source text - French ACCUEIL
Leader mondial du transport gravitaire par câble.
Des attractions exclusives pour créer ou développer votre offre de loisirs d’été ou d’hiver.
Fabricant de tyrolienne.
Cliquez sur la photo pour l’agrandir.
NOS PRODUITS
1. Le FANTASTICABLE
Le Fantasticable concept de réputation internationale constamment amélioré pour aboutir à la configuration optimale actuelle.
Nous avons ouvert notre premier site Fantasticable à Gérardmer en juin 1999.
Il est maintenant installé à La Bresse et nous l’utilisons également pour valider nos améliorations techniques.
8 installations sont actuellement en service :
-La Bresse/Haybes-Fumay/Châtel (2)/Portugal/Italie (2)/Canada
Au total, plus de 500.000 descentes sans accident significatif.
Ce résultat, nous l’avons obtenu grâce a des partenaires de compétence reconnue :
- Le Sur Mesure Industriel (étude des systèmes de freinage)
- Le Cabinet Eric (étude de la structure fixe et du génie civil)
- Mittal steel et Pfazer (conception et fourniture de câbles spéciaux)
- La CCI des Vosges pour la formation des opérateurs Fantasticable
Translation - English WELCOME
A world leader in gravity cableways.
Exclusive attractions for creating or developing your summer or winter recreational facilities.
Tyrolean traverse manufacturer.
Click on the photo to enlarge.
OUR PRODUCTS
1. The FANTASTICABLE
The Fantasticable, an internationally renowned concept that has been constantly improved to reach its current optimum configuration.
We opened our first Fantasticable site in Gérardmer in June 1999.
It is now installed at La Bresse and we also use it to develop our technical improvements.
8 facilities are currently in operation:
-La Bresse/Haybes-Fumay/Châtel (2)/Portugal/Italy (2)/Canada
In total, more than 500,000 descents without significant accidents.
We have achieved these results thanks to our recognised and competent partners:
- Le Sur Mesure Industriel (braking system design)
- Le Cabinet Eric (fixed structure design and civil engineering)
- Mittal steel and Pfazer (design and supply of special cables)
- Vosges Chamber of Trade and Industry for the training of Fantasticable operators
French to English: English translation of a brochure - on www.yooner.com Detailed field: Tourism & Travel
Source text - French Le Yooner,
La nouvelle façon de glisser !
Vous en avez rêvé : glisser sur les pistes facilement, avoir des sensations encore plus fortes, le tout sans apprentissage… C’est chose faite avec l’arrivée sur les pistes* du Yooner.
Assis à 20 cm du sol, tel un kart des neiges, ce nouvel engin est une véritable invitation à la glisse.
Son côté ludique et facile d’apprentissage vous permet en une descente de le prendre en main, que vous soyez sur une piste de ski ou de luge.
Le Yooner est léger, maniable, doté d’un amortisseur pour plus de confort et d’un patin vous permettant de « tailler des courbes » comme en ski.
Adoptez-le ! Sensations de glisse garanties !
* Stations autorisant le Yooner sur les pistes de ski sur www.yooner.com
Translation - English The Yooner,
The new way to ski!
You’ve dreamt about it: gliding effortlessly down the slopes, discovering thrilling sensations, all without learning…Your dream can come true with the arrival on the slopes* of the Yooner.
Seated 20cm above the ground, like a snow kart, this new machine is a true invitation to ski.
Its fun aspect and user-friendliness allow you to take control after just one descent and then you are off onto the ski slope or bobsleigh run.
The Yooner is light, easy to handle and is equipped with a shock absorber for more comfort and a ski which will allow you to “carve” like you would if you were skiing.
Hop on board! Gliding sensations guaranteed!
* List of resorts permitting use of the Yooner on ski slopes is available from www.yooner.com
Part-time freelance translator - July 2012 onwards
Full-time freelance - April 2010 to July 2012.
I specialise in French> English and Spanish> English translation but I am also able to work in Italian> English.
I have a Masters in Translation from Dublin City University, Ireland (2007-08) and a BA hons in French and Spanish from Queen's University of Belfast (2002-06)
I enjoy translating a variety of subjects, in particular tourism/marketing and general technical texts.