Glossary entry (derived from question below)
English term or phrase:
schedule driven management
Arabic translation:
الإدارة بالجداول الزمنية
Added to glossary by
Mohamed Salaheldin
Oct 5, 2008 10:06
15 yrs ago
2 viewers *
English term
schedule driven management
English to Arabic
Bus/Financial
Management
"schedule driven management"
and also
"event driven management"
thanks
and also
"event driven management"
thanks
Proposed translations
(Arabic)
4 +1 | الإدارة بالجداول الزمنية |
Mohamed Salaheldin
![]() |
3 +3 | الإدارة الموجهة بالأحداث / بالتوقيتات |
Khalid Nasir
![]() |
5 +1 | الاداره المساقه بالجدول المحدد |
zax
![]() |
Change log
Oct 14, 2008 18:03: Mohamed Salaheldin Created KOG entry
Proposed translations
+1
5 hrs
Selected
الإدارة بالجداول الزمنية
العمل الإداري المبني على بيانات زمنية تتعلق بتنفيذ الأعمال
4 KudoZ points awarded for this answer.
+3
1 hr
الإدارة الموجهة بالأحداث / بالتوقيتات
I do not know in which field your terms are applied. But generally speaking
"event driven" موجه أو موجهة بالإحداث
"schedule driven" موجه موجهة بالتوقيتات
In programming, system response can be generated either by an event such as a mouse clicking, window sizing or by a specified period of time.
The same can be applied in other systems .In Power Management, system response can be obtained either by an event (when a certain a value is reached or by mere timing.
Example: In event-initiated response I will cut electricity when a voltmeter reads 10 volts (regardless how long time it takes to reach this value) while in schedule-initiated response I will cut electricity each 2 hours (regardless how much volts it reads)..
I guess
"event driven" موجه أو موجهة بالإحداث
"schedule driven" موجه موجهة بالتوقيتات
In programming, system response can be generated either by an event such as a mouse clicking, window sizing or by a specified period of time.
The same can be applied in other systems .In Power Management, system response can be obtained either by an event (when a certain a value is reached or by mere timing.
Example: In event-initiated response I will cut electricity when a voltmeter reads 10 volts (regardless how long time it takes to reach this value) while in schedule-initiated response I will cut electricity each 2 hours (regardless how much volts it reads)..
I guess
Peer comment(s):
agree |
Ghada Samir
: welcome back!
11 mins
|
thanks for both your agreement and welcome
|
|
agree |
zi_neb
9 hrs
|
Many thanks and happy Eid
|
|
agree |
Mohsin Alabdali
: من غاب جاب الغنائم. عودا حميدا
14 hrs
|
تشكراتنا وكل عام وأنت والزملاء جميعا بألف خير
|
+1
3 hrs
الاداره المساقه بالجدول المحدد
الاداره حسب الجدول
Something went wrong...