Glossary entry

English term or phrase:

fill cup cut

Czech translation:

řezání plnicího hrdla

Added to glossary by Pavel Prudký
Oct 3, 2008 10:55
15 yrs ago
English term

fill cup cut

English to Czech Tech/Engineering Engineering (general)
Hole Punching/Boring Process “B”

Station B01-RPS Hole Punching and Fill Cup Cut

Operator loads fill pipe to the fixture. The fixture will use the 3D geometry around the RPS holes at the cup end of the pipe for proper location. A pneumatic cylinder will be used as an air spring to allow the top half of the fixture to be positioned by the operator. Once the clamp is in place, the operator activates the machine via a Duo-Touch two hand control module and the cylinder is energized with high pressure to firmly hold the part into position. A bar code reader will be permanently mounted in position on the machine to read the bar code.
Proposed translations (Czech)
2 řezání plnicího hrdla
Change log

Nov 22, 2008 11:03: Pavel Prudký Created KOG entry

Discussion

Prudilova (asker) Oct 4, 2008:
tak to vazne nemusite :) vetsinou prekladam techniku a hlavne hudebni obor, ale protoze spolupracuji i s agenturou, tak te prekladam cokoli mi posle a ja si na to troufnu - tzn. nekdy i jednodusi pravo.. :/ :)
Jaroslav Suchánek Oct 3, 2008:
upřímně obdivuji váš tématický záběr, Ms Prudilová!
Prudilova (asker) Oct 3, 2008:
This will verify the part has been through the cooling station and is dimensionally correct for continued processing. Pneumatic cylinders will force a set of punches through the pipe and into a die set below, forming RPS holes 1-4. While the punches remain in position through the part, a cutting head will rapidly advance to the full cup opening before starting into a controlled feed while the cutting head is engaged. Feed rate and cutting speed will be optimized during prototype runs. Based on sample cutting done as of this writing, feed rate will be between 1 and 3mm per revolution. RPM will be < 100. Slug removed will be retained on centering tool and stripped off automatically after the cutting operation is complete. Operator removes the part and places it to a flow rack, staging it in the proper orientation for the next process. Machine processing time will be < 12 seconds. Operator processing time is < 12 seconds. Total effective cycle time is < 24 seconds.

jinde jsem fill cup neobjevila :(
Pavel Prudký Oct 3, 2008:
Nemáte to dále? Tato operace popisuje pouze upnutí, o řezání ani zmínka.
Kromě toho, máte „Fill Cup“ ještě někde jinde v textu? V jakém kontextu?

Proposed translations

59 mins
Selected

řezání plnicího hrdla

Asi bych dal toto, to mi přijde nejlogičtější. Obrázek by samozřejmě pomohl..l


--------------------------------------------------
Note added at 4 days (2008-10-07 11:37:55 GMT) Post-grading
--------------------------------------------------

děkuji
Note from asker:
diky.. opravdu to zni logicky :) obrazek bohuzel neni... :(
Something went wrong...
3 KudoZ points awarded for this answer. Comment: ":)"

Reference comments

1 hr
Reference:

Jen pro zajimavost, nejaky malickaty obrazek by se nasel - jestli je to ono. /viz link/
Something went wrong...
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search